亚洲国产香蕉视频欧美,2021亚洲精品午夜精品国产,精品一区二区AV天堂,91一区二区三区在线

Hydrolyzed pan waste steam dealing process


Summary

The discharge pressure of hydrolyzed is 0.2MPa, the Moisture in furfural scraps is steamed instantly, the process collect waste steam by draught fan and then condensate ,wash and recycle part of furfural in waste steam, and eliminate waste residue flash steam when discharging to improve the production environment.

Second, the process flow chart:blob.png

Service hotline: 0538-3399066;0538-3393566;0538-3393266

Fax: 0538-3399066

Zip code: 271600

Address: Feicheng High-tech Industrial Development Zone, Shandong Province




2022 Shandong Jinta Machinery Group Co., Ltd. All rights reserved. 




技術(shù)支持:掘金科技

WeChat

WeChat

WeChat

WeChat

Wechat

Wechat